Stuff I Did – January

I decided that it would be much more useful (and much less painful) to list the stuff that I did in a given month, rather than the stuff that I should have done and didn’t do.  Obviously, there’s a huge (hyuuuuuuge) to-do list behind this, but it’s more positive to be positive, or so I think.

  • Cleaned out garage.  This means that all of the tile stuff is downstairs for mosaic projects (if and when I find time), all the dirt and leaves and grass have been swept out, all the cobwebs are gone, and all of the stuff on the shelves is more-or-less straightened out.  A good day’s work.
  • Took down the Christmas tree.  Got everything downstairs, too.
  • Fixed the big hole in the wall.  Right before Christmas, I was walking a big bag downstairs; I missed the last step and sent the bag swinging into the wall.  I patched the drywall with spackle, and it looks OK.
  • Repaint downstairs bathroom wall:  Don’t want to get into details, but there was some damage to the paint in the downstairs bathroom, and I put the first coat down yesterday.
  • Query letters:  I have four or five out (with one insta-rejection); waiting to hear back on some of those before sending out a couple more.  If these don’t pan out, then it’s back to the drawing board.
  • Got pictures hung up:  the ketubah from our wedding, and the new baby picture we got.

Leave a Reply

CommentLuv Enabled